Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Aggregate Base, 3/4" Class II (FY 15/16)

Awarded contract·San Joaquin County·California

Aggregate Base, 3/4" Class II (FY 15/16)

Won by FTG Construction Materials, Inc +1 more$296kMultiple Award
Contract source

Awarded vendors

  • FTG Construction Materials, Inc
  • California Materials, Inc

Description

This contract is for the supply of Aggregate Base, 3/4" Class II for San Joaquin County Road Restoration Projects. The contract was awarded to two vendors, FTG Construction Materials, Inc and California Materials, Inc, for different jobsites. The contract includes a list of prices for different materials and haul charges. The vendors are required to deliver the materials to various sites within San Joaquin County. • The contract includes a list of documents, including a bid recap and a final award tabulation. • The contract was posted on June 22, 2015, and the bid submission date was July 2, 2015. • The contract includes a notice of award information, which lists the awarded vendors and the prices for each jobsite. • The contract includes a list of contacts, including the bid contact and the vendor support email.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
212321
Solicitation №
7006

Contract value

$295,765

Based on the contract documents, the total value of the contract can be estimated by calculating the total cost of the materials and haul charges for each jobsite. The total cost for each jobsite is: Jobsite #1: $48,256.20 Jobsite #2: $60,224.25 Jobsite #3: $43,161.25 Jobsite #4: $42,102.40 Jobsite #5: $52,021.44 The total value of the contract is approximately $295,765.54. However, this is just an estimate and the actual value of the contract may be higher or lower, depending on various factors such as the actual quantity of materials delivered and the haul charges.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Kansas Department of Transportation·Kansas

Top match · 66%

Aggregates

Closes 11/3/2026Opened 9/28/2026

Virginia Department of Transportation·Virginia

66% match

IFB 161298 - Delivered Aggregate Petersburg Res

Closes 11/5/2026Opened 10/20/2026

Virginia Department of Transportation·Virginia

65% match

IFB# 161286 Delivered Aggregate - MsVille

Closes 11/9/2026Opened 10/15/2026

Saline County·Kansas

65% match

2027 Aggregates

Closes 11/12/2026Opened 10/9/2026

U.S. Department Of Defense·Virginia

64% match

AIRCRAFT, FIGHTING FALCON F-16; HOUSING, ANTIFRICTION BEARING

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·Utah

64% match

F-16 Wheel Housing Section

Closes 11/6/2026Opened 10/2/2026

U.S. Department Of Defense·Utah

64% match

F-16 Wheel Housing Section

Closes 11/6/2026Opened 9/29/2026

U.S. Department Of Defense·Alabama

64% match

Weight Assy, Bifilar

Closes 11/2/2026Opened 4/2/2026

U.S. Department Of Defense·New Jersey

64% match

BRACE, AIRCRAFT GROUND SERVICING

Closes 11/19/2026Opened 10/27/2026

U.S. Department Of Defense·Utah

63% match

F-16 Horizontal Stabilizer

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

63% match

25--HOUSING,AXLE ASSEMBLY,

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·Virginia

62% match

31- Bearing, Roller, Cylindrical

Closes 11/9/2026Opened 10/21/2026

U.S. Department Of Defense·Alabama

62% match

Overhaul of the AH-64 Apache Housing Assy, Pitch M/R

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·Texas

62% match

FY26 Harlingen Placement Area (PA)13 and 10 Improvements

Closes 12/17/2026Opened 12/3/2025

U.S. Department Of Defense·U.S. Armed Forces – Pacific

62% match

AFHC Repair Quarters 82 and 86, Camp Zama, Japan

Closes 11/10/2026Opened 6/16/2026

U.S. Department Of Defense·Kansas

62% match

Aggregate Stone Material - Fort Riley, Kansas

Closes 11/7/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

62% match

61--BASE ASSEMBLY,MOUNT

Closes 11/12/2026Opened 10/29/2026

Iowa Department of Transportation·Iowa

62% match

Concrete Crushing and Mobilization

Closes 11/9/2026Opened 10/19/2026

U.S. Department Of Defense·Texas

62% match

RFI: Fort Wolters H Barracks

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·Washington

62% match

Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·Virginia

62% match

31- Bearing, Ball, Annular

Closes 11/10/2026Opened 10/22/2026

Washoe County·Nevada

62% match

ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION Washoe County Behavioral Health Project GMP-2

Rolling / TBD closeOpened 11/23/2025

U.S. Department Of Defense·North Carolina

62% match

MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)

Closes 11/5/2026Opened 9/29/2026

U.S. Department Of Defense·California

62% match

163rd CE Flooring & Painting 2272

Closes 11/6/2026Opened 10/27/2026

U.S. Department Of Defense·Virginia

62% match

31- BEARING, BALL, ANNULAR

Closes 11/6/2026Opened 10/21/2026