The Town of Exeter issued an RFP for professional engineering consulting services to design replacement culverts on Linden Street and Court Street over the Little River. The scope includes investigation, hydraulic and geotechnical analysis, permitting, utility coordination, design plans, specifications, and cost estimate updates. The award went to CMA Engineers, Inc. for a design budget of $150,000, with later construction phases anticipated for 2015‑2016.
• Design of two culverts to meet regulatory, hydraulic, and structural requirements.
• Required deliverables: surveys, utility coordination, permitting assistance, design drawings, specifications, and updated probable‑cost estimates.
• Project timeline centers on a proposal deadline of Dec 31 2013; design work to be completed “as expeditiously as possible” with cost updates due by May 15 2014.