Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›2020-21 South County Overlay - Various County Roads…

Awarded contract·County of San Luis Obispo·California

2020-21 South County Overlay - Various County Roads - Nipomo and Los Osos - County of San Luis Obispo, CA

Won by Papich Construction Company +2 more$8.5MMultiple Award
Contract source

Awarded vendors

  • Papich Construction Company
  • Granite Construction Company
  • CalPortland Construction

Description

The contract is for the 2020-21 South County Overlay project, which involves placing a new hot mix asphalt overlay on existing roads in the areas of Nipomo and Los Osos. The project includes cold plane asphalt concrete road surfaces, placing hot mix asphalt overlay, digout repairs, and other such items or detail work as required and included in the plans, standard specifications, standard plans, or special provisions. The engineer's estimate for the project is $7,878,950.00. The contract was awarded to three vendors: Papich Construction Company, Granite Construction Company, and CalPortland Construction. The contract includes various line items, such as construction staking, traffic control system, portable changeable message sign, and hot mix asphalt overlay. • The project location is in San Luis Obispo County, CA. • The project manager is Evelyn Sanchez, and the project engineer is Steve Jones. • The bid contact is Ryan Monie, who can be reached at [email protected] or (805) 781-5523. • The contract includes additive bid items for ADA improvements, Los Osos Valley Road improvements, and Nipomo CSD utility access adjustments. • The total bid amount for the contract is approximately $8,349,675.00 for Papich Construction Company, $8,350,425.00 for Granite Construction Company, and $8,731,354.00 for CalPortland Construction.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
300648

Contract value

$8,500,000

The contract value can be estimated based on the total bid amount, which is approximately $8,349,675.00 for Papich Construction Company, $8,350,425.00 for Granite Construction Company, and $8,731,354.00 for CalPortland Construction. The engineer's estimate for the project is $7,878,950.00, which is lower than the bid amounts. Considering the bid amounts and the engineer's estimate, a reasonable estimate for the contract value would be around $8 million to $9 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

County of Stanislaus·California

Top match · 67%

Safe Streets and Roads for All Safety Action Plan and Planning Guidelines

Closes 11/19/2026Opened 10/21/2026

Los Angeles County·California

67% match

RFB-IS-27200273 - 27-00240 TRAFFIC PLAN SOW - Closing: 11/16/2026 12:00 PM

Closes 11/16/2026Opened 10/29/2026

Missouri Department of Transportation·Missouri

67% match

St. Louis District, St. Louis County, Airport Road Multimodal Improvements traffic calming, pavement striping, and installing flexible plastic delineators between North Hanley Road and New Florissant Road

Closes 11/18/2026Opened 10/13/2026

LA County Health Services·California

67% match

Transportation Overflow Services Master Agreement

Rolling / TBD closeOpened 9/11/2025

West County Wastewater·California

66% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

County of San Luis Obispo·California

66% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

LA County Internal Services Department·California

66% match

27-00240 TRAFFIC PLAN SOW

Closes 11/16/2026Opened 10/28/2026

County of Orange·California

66% match

Modjeska Grade Road, Road and Drainage Improvements

Closes 11/10/2026Opened 10/13/2026

LA County Internal Services Department·California

66% match

AS-NEEDED TRANSPORTATION SERVICES

Rolling / TBD closeOpened 10/26/2020

Town of South Hill·Virginia

65% match

IFB FY27-01: Asphalt Overlay & Traffic Marking

Closes 11/18/2026Opened 10/21/2026

Missouri Department of Transportation·Missouri

65% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

Colusa County·California

65% match

RFP - (SS4A) Countywide Transportation Safety Planning

Closes 11/16/2026Opened 9/28/2026

Los Angeles County Public Works·California

65% match

RMDJOC6788 Pavement Reconstruction (Sustainable) North Los Angeles County

Closes 11/3/2026Opened 10/6/2026

Beaufort County, SC·South Carolina

65% match

Beaufort County 2027 Resurfacing

Closes 11/17/2026Opened 10/16/2026

County of Colusa·California

65% match

RFP- (SS4A) Countywide Transportation Safety Planning

Closes 11/16/2026Opened 9/28/2026

County of Santa Cruz·California

65% match

SOQUEL SAN JOSE RD PM 5.55 STORM DAMAGE REPAIR PROJECT, FEDERAL PROJECT No. ER-15J2 (004)

Closes 11/5/2026Opened 10/8/2026

Bay County·Florida

65% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

Baltimore County, Maryland·Maryland

65% match

Road Safety Audits: Safe Streets and Roads for All Program (SS4A)

Closes 11/20/2026Opened 10/23/2026

Sarasota County·Florida

65% match

South County Fleet Renovation

Closes 11/11/2026Opened 10/8/2026

Bay County, FL·Florida

65% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

California Department of Transportation·California

65% match

IFB Title and Escrow Services in Tuolumne County

Closes 11/10/2026Opened 10/19/2026

California Department of Transportation·California

65% match

Modify existing drainage, replace lighting systems, and install TMS.

Closes 11/17/2026Opened 9/28/2026

Sarasota County·Florida

64% match

Physical Map Revision for Little Sarasota Bay, Lemon Bay, and Phillippi Creek Watersheds

Closes 11/19/2026Opened 10/21/2026

County of Butte·California

64% match

New County Vehicles

Closes 11/10/2026Opened 10/27/2026

Orange County, Florida·Florida

64% match

Orange County Traffic Signal Upgrade Phase I and Phase II

Closes 11/3/2026Opened 8/17/2026