Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›Cougar Mountain 3A Reservoir Reline Project

Awarded contract·City of Bellevue·Washington

Cougar Mountain 3A Reservoir Reline Project

Won by Coastal Services Inc. +4 more$315kMultiple Award
Contract source

Awarded vendors

  • Coastal Services Inc.
  • S & K Painting Inc.
  • Industrial Coatings Unlimited LLC
  • Long Painting Co.
  • Coating Applications

Description

The contract is for the Cougar Mountain 3A Reservoir Reline Project, which involves removing and relining the interior coated surfaces of the reservoir. The project includes removing existing coatings, applying primer and top coatings, and reinstalling interior tank cathodic protection system components. The engineer's estimated range for the project is $289,602 to $337,869. The contract was awarded through a public bid process, with multiple vendors submitting bids. Key aspects of the project include the removal and reline of the reservoir, as well as the installation of a new cathodic protection system. The project is located in Bellevue, Washington, and the City of Bellevue is the contracting agency. Some of the key features of the project include: • Removal and reline of the interior coated surfaces of the reservoir • Application of primer and top coatings • Reinstallation of interior tank cathodic protection system components • The project is located at 17617 SE Cougar Mountain Drive, Issaquah, WA 98027 • The reservoir is a 300,000 gallon welded steel tank, approximately 22 feet high and 50 feet in diameter • The project includes other work as required to complete the project and is indicated in Cougar Mountain Reline Project Figures (Appendix K)

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
20019

Contract value

$315,000

The contract's dollar amount value can be estimated based on the engineer's estimated range, which is $289,602 to $337,869. The total bid price for the project is $321,779.54. Therefore, the estimated value of the contract is around $300,000 to $350,000. Factors that may influence the likely contract value include the complexity of the project, the materials and labor required, and the location of the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Imperial Irrigation District·California

Top match · 65%

East Highline Reservoir Project

Closes 12/2/2026Opened 9/10/2026

Inland Empire Utilities Agency·California

65% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

North Central Missouri Regional Water Commission·Missouri

64% match

REBID NCMRWC Roy Blunt Multi-Purpose Reservoir

Closes 11/5/2026Opened 10/15/2026

Gwinnett County Government·Georgia

64% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

State of West Virginia·West Virginia

64% match

OSR Buffalo Coal Company C1 EQ Basin Project S-2003-03

Closes 11/4/2026Opened 10/26/2026

State of West Virginia – Office of Special Reclamation (Environmental Protection)·West Virginia

63% match

OSR Buffalo Coal Company C1 EQ Basin Project S-2003-03

Closes 11/4/2026Opened 10/30/2026

U.S. Department Of Agriculture·Wyoming

63% match

4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming

Closes 11/17/2026Opened 9/30/2026

U.S. Department Of Transportation·Mississippi

63% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of The Interior·Colorado

63% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

Virginia Department of Energy·Virginia

63% match

Brush Mountain Portals II Project

Closes 11/2/2026Opened 10/27/2026

U.S. Department Of Transportation·Wyoming

63% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

City of Santa Rosa·California

62% match

Bennett Valley Golf Course Irrigation System Improvements

Closes 11/5/2026Opened 10/6/2026

Gwinnett County Government·Georgia

62% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

U.S. Bureau of Reclamation·United States of America

62% match

Title XVI Water Reclamation and Reuse Projects

Closes 8/26/2027Opened 5/14/2026

City of Pomona·California

62% match

RESERVOIR NO. 2C REPAIRS AND SAFETY IMPROVEMENTS FD528 – CC8125 – PROJECT WORKTAG 95082

Closes 11/18/2026Opened 10/8/2026

Montana Department of Natural Resources and Conservation·Montana

62% match

2026 Summit DMA Orphan Well P&A

Closes 11/24/2026Opened 10/30/2026

Colorado Division of Parks and Wildlife·Colorado

62% match

PMAA, SEJM, John Martin Res SP Day Use Imp, C23JM1

Closes 11/19/2026Opened 10/30/2026

U.S. Department Of Defense·New Hampshire

62% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

City of Rockford·Illinois

62% match

WELL 6 RESERVOIR REHAB

Closes 11/10/2026Opened 10/13/2026

City of Plano·Texas

62% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

U.S. Department Of The Interior·Wyoming

62% match

Z--YELL 338223 - Bridge Preservation

Closes 11/6/2026Opened 10/7/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

62% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

City of Waco·Texas

62% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

City of Farmington·New Mexico

62% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026