The City of Spokane awarded a competitive RFQ (5474‑21) for the design‑build fabrication and purchase of ten upriver dam spillway stoplogs and one lifting‑beam assembly. The contract required steel fabrication to ASTM specifications, shop assembly, coating, testing, and delivery for test‑fit, followed by final coating and shipment. Finnoe Design, LLC won the award with a total lump‑sum price of $159,275. The technical package includes detailed engineering drawings, a bill of materials, material specifications (ASTM A36, A572‑Gr‑50, stainless‑steel fasteners, rubber seals), and stringent welding and coating requirements.
• Scope: Fabricate 10 custom steel stoplogs (2 with fill valves) and a lifting‑beam assembly; include freight, test‑fit, and coating.
• Requirements: ASTM‑listed steel, high‑solids epoxy coating, magnetic‑particle weld inspection, certifications, and detailed shop drawings.
• Award: Finnoe Design, LLC – $159,275 lump‑sum; other bidders were Northwest Steel Fabrication Inc. and Vanport Marine, Inc.