25/0059 - Construction of Floating Vegetated Islands at Rev. William and Audrey Lawson Stormwater Detention Basin for the Harris County Flood Control District
Won by HGS, LLC dba RES Environmental Operating Company, LLC$1.1MSingle Award
HGS, LLC dba RES Environmental Operating Company, LLC
Description
The contract is for the construction of floating vegetated islands at the Rev. William and Audrey Lawson Stormwater Detention Basin for the Harris County Flood Control District. The project aims to provide environmental stormwater quality benefits to the existing stormwater detention basin. The contract was awarded to HGS, LLC dba RES Environmental Operating Company, LLC, with a total cost of $1,053,985. The project is expected to enhance stormwater quality, reduce flooding, and improve drainage in the area. Key aspects of the project include the construction of floating vegetated islands, excavation and fill, structural concrete, and site preparation and restoration.
• Construction of floating vegetated islands
• Excavation and fill
• Structural concrete
• Site preparation and restoration
• Enhancement of stormwater quality
• Reduction of flooding
• Improvement of drainage