This contract is for lead abatement work at 594 Lovers Lane, Akron, Ohio. The work includes removing and replacing windows, doors, and other components, as well as painting and stabilizing surfaces in accordance with HUD regulations. The contract also includes the installation of smoke detectors and CO detectors. The contractor is required to follow all applicable local building codes and regulations, including OSHA and EPA guidelines. The contract is expected to be completed within 30 days of signing, and the contractor is required to provide all necessary labor, materials, and equipment to complete the work.
• The contract includes a total of 31 items, including exterior and interior work, window replacements, and healthy homes repairs.
• The contractor is required to verify all counts on windows and other components during the pre-bid meeting and bid accordingly.
• The contract includes a number of allowances for labor and materials, including $400 for bathroom door replacement and $1,700 for water heater replacement.
• The contractor is required to install smoke detectors and CO detectors in accordance with local building codes and regulations.
• The contract includes a number of documents, including the Lead Based Paint Hazard Control Program Contractor's Agreement and the Required Forms_Lead Abatement and Healthy Homes.