The contract is for the construction of the 2014 Local and Collector Street Mill & Overlay project in Olathe, Kansas. The work consists of milling and resurfacing eighty-six local residential asphalt streets, including approximately 229,767 square yards of 2” depth full width milling, 26,710 tons of 2” depth asphalt surface placement, pavement markings, 186 ADA sidewalk ramps, sidewalk removal and replacement, and 20,575 linear feet of spot curb replacement. The successful bidder will be required to furnish and pay satisfactory performance and payment bond or bonds. The City of Olathe reserves the right to reject any or all bids or to waive any informality in the bidding.
• The project includes milling and resurfacing of local residential asphalt streets
• The project includes installation of ADA sidewalk ramps and removal and replacement of sidewalks and curbs
• The successful bidder will be required to furnish and pay satisfactory performance and payment bond or bonds
• The City of Olathe reserves the right to reject any or all bids or to waive any informality in the bidding