The Driscoll Community Center Project is a construction project that involves the construction of a new community center building using 2X6 wood studs for the exterior walls with batt insulation and dens-glass sheathing on the exterior face with hardi-plank siding and gyp. bd. interior sheathing. The project must be completed within 210 calendar days after the date of the Notice to Proceed for the Base Bid. The contract was awarded to six vendors: EP Remodeling Services, LLC, Gourley Contractors, LLC, Progressive Structures, Inc, RXDX, LLC, South Texas Building Partners, and Bonco, LLC. Some key features of the project include:
• Construction of new Community Center Building
• Use of 2X6 wood studs for exterior walls
• Use of batt insulation and dens-glass sheathing on the exterior face
• Use of hardi-plank siding and gyp. bd. interior sheathing
• Construction of interior walls using 2X4 wood studs with batt insulation and a layer of gyp. bd. on each side
• Roof framing will be wood trusses designed by truss manufacturer, with 5/8” plywood deck with composition shingle roofing
• Ceilings will be suspended acoustical 2X2 with 2x4 LED light fixtures
• Building will be constructed on a slab-on-grade foundation with rebar reinforcing
• The Contractor shall provide all tools and equipment that are necessary to complete the project in its entirety
• All work shall be in accordance with the scope of work
• All materials used for the project shall be equal to or better than the existing materials quality
• The Contractor will be responsible for removal and disposal of all demolished materials and debris from the work area
• The Contractor shall take proper care to avoid unnecessary noise, clatter or obstructions in walkways, sidewalks, and roadways
• The Contractor shall not interfere with use or safe passage to and from building and adjacent facilities