This contract calls for the complete modernization of the two elevators at Jules E. Mastbaum School in Philadelphia, PA. The scope includes installation of a Smartrise (or equivalent) elevator controller, re‑drilling of the well‑hole, provision of 24 months of post‑warranty maintenance, and installation of specified Lithonia lighting fixtures and electrical components. The project also requires a 200 A main line disconnect for each elevator, a split‑system HVAC feed, and acceptance of a “Jack‑It” well‑hole liner option. The awarded contractor, T.E. Construction Services, will perform the work under a lump‑sum price of approximately $1.06 million.
• Elevator modernization for two school elevators, including controller, wiring, and lighting upgrades.
• Mandatory 24‑month maintenance period beginning after a 12‑month warranty.
• Detailed equipment specifications (Smartrise controller, Lithonia LED fixtures, 200 A disconnects, etc.) and requirement that re‑drilling costs be included in the base quote.