The City of Palm Bay is seeking a contractor to replace the existing aerobic digester aerators and renovate the walkway and tank at the Troutman Wastewater Treatment Plant. The work includes demolition and disposal of existing aerators, walkways, and concrete steps, as well as the installation of new floating aerators and miscellaneous concrete repairs. The engineer's estimate for the project is between $200,000 and $300,000. The project requires the contractor to maintain continuous, uninterrupted conveyance, storage, handling, treatment, and disposal of solids and wastewater throughout the construction period.
• The project involves demolition and disposal of existing precast concrete double tee walkways, concrete topping, and concrete steps.
• The project includes the installation of six constant-speed floating direct drive aerators.
• The project requires the contractor to repair and/or replace tank guardrail and digester concrete tank walls.
• The project involves miscellaneous concrete work and deducts for biosolids hauling.