Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Engineering Services
  5. ›RFQ: Sheridan and Morrison Intersection Improvements

Awarded contract·City and County of Denver·Colorado

RFQ: Sheridan and Morrison Intersection Improvements

Won by ACL, Inc.$800kAwarded 7/1/2025Single Award
Contract source

Awarded vendors

  • ACL, Inc.

Description

The City and County of Denver’s Department of Transportation and Infrastructure (DOTI) awarded a design‑only contract to ACL, Inc. for the Sheridan and Morrison Intersection Improvements project. The scope focuses on redesigning traffic signal infrastructure, turn‑lane geometry, pedestrian amenities, and roadway resurfacing to enhance safety and comply with Vision Zero goals. The procurement was conducted via a public RFQ (Solicitation No. 202477024) with a mandatory electronic submission through BidNet, a 10 % DBE participation requirement, and strict adherence to insurance and civil‑rights provisions. • Design services include reconstruction of the signal, timing/phasing updates, slip‑lane redesign, crosswalk relocation, and ADA‑compliant curb‑ramp upgrades. • Mandatory electronic bid submission by April 8 2025; award announced July 1 2025. • DBE participation set at 10 %; vendor must meet CDOT’s DBE documentation requirements.

Attached files

Key dates

Bids closed
4/8/2025
Intent to award
7/1/2025
Awarded
7/1/2025
Starts
7/1/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
202477024

Contract value

$800,000

No explicit contract value is disclosed. However, similar municipal intersection design projects in Colorado typically range from $500,000 to $1,200,000 depending on complexity, DBE participation, and the extent of signal and roadway redesign. Given the nine‑item scope (signal reconstruction, timing, lane geometry, pedestrian upgrades, and resurfacing) and the high‑injury‑network status, a reasonable midpoint estimate is roughly $800,000. This estimate assumes standard professional‑services rates, necessary sub‑consultant fees, and modest contingency.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Massachusetts City of Brockton·Massachusetts

Top match · 76%

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

NYS East Fishkill, Town of·New York

72% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Smithville·Missouri

72% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026

City of Albany·Georgia

71% match

Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

Georgia City of Albany·Georgia

71% match

27-024 Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

City of Charlotte·North Carolina

71% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

71% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

City of Seattle·Washington

70% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

City of Ontario·California

70% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Binghamton·New York

70% match

RFQ: Combined Sewer Overflow Outfall B001 Screening Improvements

Closes 11/4/2026Opened 10/28/2026

City of Fort Smith·Arkansas

70% match

Traffic Signal Improvements Phase A – 2024 Capital Improvements Program

Closes 11/10/2026Opened 10/25/2026

City of Bloomington·Indiana

69% match

3rd Street Traffic Signal Improvements S. Woodlawn Avenue & S. Hawthorne Drive

Closes 11/18/2026Opened 10/29/2026

NYS Monroe County·New York

69% match

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

City of Moline·Illinois

69% match

Ave. of the Cities & 53rd St. Intersection Project

Closes 11/10/2026Opened 10/25/2026

City of Seattle·Washington

69% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Richmond Government·Virginia

69% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Massachusetts Department of Transportation·Massachusetts

69% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

Arizona City of Chandler·Arizona

69% match

Invitation to Bid - City of Chandler Ray Road and Dobson Road Intersection Improvements, Project No. ST2103.401, CHN-0(255)D, T0527 01C

Closes 11/19/2026Opened 9/3/2026

City of Stillwater·Oklahoma

69% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026

Town of Bluffton·South Carolina

69% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

City of Pueblo·Colorado

69% match

West Side Improvements - Bus Stops Package 1

Closes 11/4/2026Opened 9/22/2026

City of Fort Smith·Arkansas

69% match

TRAFFIC SIGNAL IMPROVEMENTS 25-09-A

Closes 11/10/2026Opened 10/21/2026

City of Killeen·Texas

69% match

Rosewood Drive & Aspen Drive Intersection Improvements

Closes 11/12/2026Opened 10/26/2026

City of Binghamton·New York

69% match

RFQ: Clinton Street Reconstruction & Streetscape Design

Closes 11/18/2026Opened 10/20/2026

City of Carrollton·Texas

68% match

Josey-Parker Intersection Improvements

Closes 11/5/2026Opened 10/15/2026