Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›AC Overlay Project - SB 1 Phase 4

Awarded contract·County of Sacramento - Construction·California

AC Overlay Project - SB 1 Phase 4

Won by Martin Brothers Construction$5.9MSingle Award
Contract source

Awarded vendors

  • Martin Brothers Construction

Description

The contract is for the AC Overlay Project - SB 1 Phase 4, which includes the furnishing of all labor, materials, and equipment for doing all the work necessary associated with placing a conventional or rubberized asphalt concrete pavement overlay or slurry seal. The estimated construction cost is $7,400,000. The contract was awarded to Martin Brothers Construction with a total bid of $5,864,022.50. • The project includes placing a conventional or rubberized asphalt concrete pavement overlay or slurry seal • Repairing failed pavement and grinding the pavement to accommodate the overlay • Adjusting manholes to grade and installing sidewalk accessibility ramps • Placing pavement striping, markings, and markers • The contract requires a Class A - General Engineering Contractor license • The bid opening was live-streamed and a recording is available online

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Construction
NAICS
237310
Solicitation №
4470

Contract value

$5,864,023

The estimated construction cost of the project is $7,400,000, but the contract was awarded to Martin Brothers Construction for $5,864,022.50. This suggests that the actual value of the contract may be lower than the estimated cost. However, without further information, it is difficult to determine the exact value of the contract.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of San Antonio·Texas

Top match · 68%

23-04203-05 2027 Street Rehabilitation Package 5 - Overlay

Closes 12/8/2026Opened 10/28/2026

Texas City of San Antonio·Texas

66% match

2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

City of San Antonio·Texas

66% match

23-04203-08 2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

City of San Antonio·Texas

66% match

23-04203-06 2027 Street Rehabilitation Package 6 - Overlay

Closes 12/11/2026Opened 10/28/2026

City of Bartlesville·Oklahoma

66% match

Bid 2026-2027-012 Spruce Ave. Overlay

Closes 11/23/2026Opened 10/31/2026

Illinois Tollway·Illinois

66% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

Tacoma·Washington

65% match

E Portland Ave (64-72) Overlay

Closes 11/3/2026Opened 9/29/2026

Texas City of San Antonio·Texas

65% match

2027 Street Rehabilitation Package 5 – Overlay

Closes 12/8/2026Opened 10/28/2026

Texas City of San Antonio·Texas

65% match

2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

City of San Antonio·Texas

65% match

23-04203-07 2027 Street Rehabilitation Package 7 – Overlay

Closes 12/15/2026Opened 10/28/2026

California Department of Transportation·California

64% match

Bridge overlay, approach slab, joint seal, HMA, and cold plane.

Closes 11/10/2026Opened 10/12/2026

Metro Development District·Florida

64% match

N. Sunlake Blvd. Segment 4 Phase 1

Closes 11/12/2026Opened 10/1/2026

California Department of Transportation·California

64% match

Cold plane AC Pvmt, RHMA-G overlay, landscape, Elect., and drainage.

Closes 12/16/2026Opened 10/26/2026

Santa Clara Valley Transportation Authority·California

64% match

Pre-Qualification: Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East

Closes 11/13/2026Opened 9/30/2026

California Department of Transportation·California

64% match

Furnish and place polyester concrete overlays & replace joint seals.

Closes 11/5/2026Opened 10/5/2026

Atlantic County Special Services School District·New Jersey

64% match

Bid 27-01 ACSSSD 18-21 Suite Addendum 1 (26.055 2026-09-10 )

Rolling / TBD closeOpened 9/10/2026

Catawba Regional Council of Governments·South Carolina

64% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

NYS Rochester, City of·New York

64% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

California Department of Transportation·California

63% match

Install capture housing, landscape, and electrical.

Closes 11/4/2026Opened 9/28/2026

Los Angeles County Public Works·California

63% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of Santa Cruz·California

63% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

City of Palmdale·California

63% match

Arterial Maintenance Overlay PMP

Closes 11/10/2026Opened 10/8/2026