The 2013 KLINK 1R Resurfacing K-7 Highway project involves improvements to K-7 Highway, including milling, superpave asphalt overlay, miscellaneous sidewalk, spot curb and gutter replacement, storm sewer improvements, and ADA ramp improvements. The project also includes pavement marking and signal modifications. The bid documents, including drawings and specifications, are available for download, and the engineer's estimate is $1,128,990.05. The successful bidder will be required to furnish and pay satisfactory performance and payment bond or bonds.
• The project requires a satisfactory bid bond executed by the bidder or an acceptable surety, in an amount equal to five percent (5%) of the total bid for work.
• The City of Olathe reserves the right to reject any or all bids or to waive any informality in the bidding.
• Bids may be held by the City of Olathe for a period not to exceed sixty (60) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract.