This contract calls for the complete wet demolition and site remediation of a damaged wood‑frame structure at 206 N. Ann St., Mobile, AL. The contractor must remove all building components, cap utility lines, control erosion, manage hazardous waste (lead‑based paint and asbestos), and restore the lot with permanent stabilization. All work must be finished within 15 calendar days of receiving a Notice to Proceed, with liquidated damages for delays, and includes detailed close‑out documentation and a newspaper notice of final completion.
• Wet demolition of the structure, footings, slabs, bricks, and vegetation; removal of hazardous materials.
• Cap and certify sanitary sewer, water, and gas utilities; provide erosion‑control BMPs and permanent seeding/mulching.
• Submit insurance, E‑Verify, payment applications, and final affidavits; publish final‑completion notice in a local newspaper.