The contract is for the 2022 Utilities On-Call Asphalt Restoration project, which includes services such as remove and replace defective HMA surfaces and patches, installation of emulsified asphalt sealant, and traffic control. The engineer's estimate for the project is $1,329,480.90. The contract was awarded to JB Asphalt & Paving, with a total bid price of $2,438,315.00. The scope of work includes various asphalt restoration services, property restoration, and miscellaneous work.
• Remove and replace defective HMA surfaces and patches
• Installation of emulsified asphalt sealant
• Remove and replace Cement Concrete Curb Ramp
• Remove and replace Cement Concrete Curb and Gutter
• Remove and replace Cement Concrete Extruded Curb
• Remove and replace Cement Concrete Sidewalk
• Remove and replace Cement Concrete Driveway Approach
• Asphalt Parking Lot and Paved Trail Repair
• Adjust/Replace Manhole Ring and Covers, Catch Basin Frame and Grate, Water Valve Boxes
• Property Restoration and Miscellaneous Work including Traffic Markings
• Traffic Control and related services