Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Water and Wastewater
  5. ›REHABILITATION OF THE ROCKY HILL OUTFALL AND ROCKY HILL…

Awarded contract·The Metropolitan District·Connecticut

REHABILITATION OF THE ROCKY HILL OUTFALL AND ROCKY HILL INTERCEPTOR

$1MAwarded 10/17/2016Single Award
Contract source

Description

This contract calls for the rehabilitation of two municipal sewer sections in Connecticut using cured‑in‑place pipe (CIPP) technology. The scope includes lining 3,360 linear feet of a 36‑inch sanitary sewer outfall and 2,700 linear feet of a 39‑inch interceptor, encompassing all labor, equipment, permits, and related costs. The project seeks a qualified contractor holding a DAS Contractor Prequalification Certificate for sewer and water lines, with a mandatory pre‑bid conference on April 26, 2016 and a sealed‑bid deadline of May 25, 2016. The award was made on October 17, 2016 by the Metropolitan District of Connecticut. • Required CIPP work on 6,060 ft of existing sewer pipe to improve capacity and structural integrity. • Bidders must submit a 10 % bid security and possess current DAS pre‑qualification for the relevant classification. • Project location spans the Towns of Wethersfield and Rocky Hill, CT.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
5/25/2016
Intent to award
10/17/2016
Awarded
10/17/2016

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
2016B-04

Contract value

$1,000,000

The solicitation does not disclose a contract value. However, cured‑in‑place pipe (CIPP) rehabilitation typically costs between $120‑$180 per linear foot, depending on pipe size, site access, and material specifications. Using a midpoint of $150/ft for the combined 6,060 ft (3,360 ft + 2,700 ft) yields an estimated material and labor cost of roughly $909,000. Adding overhead, bonding, and contingency (≈10 %) brings the total to about $1 million. Therefore, a reasonable ball‑park estimate for the contract value is approximately $1 M.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 66%

Rocky Falls Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2028

Pennsylvania Department of Environmental Protection·Pennsylvania

64% match

Abandoned Mine Reclamation Project – Rocky Glen Pond, Moosic Borough, Lackawanna County

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of Transportation·Washington

63% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/13/2026Opened 9/30/2026

Gwinnett County Government·Georgia

62% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

U.S. Department Of Transportation·Washington

62% match

WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4

Closes 11/4/2026Opened 9/30/2026

City of Charlotte·North Carolina

62% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

Village of Cary·Illinois

62% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

City of Casper·Wyoming

62% match

GLENDALE DETENTION POND IMPROVEMENTS

Closes 11/6/2026Opened 10/17/2026

City of Charlotte·North Carolina

62% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

U.S. Department Of Transportation·North Dakota

62% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

Idaho Transportation Department·Idaho

61% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

San Gabriel Unified School District·California

61% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

U.S. Department Of The Interior·Hawaii

61% match

Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment

Closes 11/6/2026Opened 10/13/2026

Maryland Baltimore County Government·Maryland

61% match

26030 GX0 Old Frederick Road Slope Stabilization

Closes 11/5/2026Opened 8/29/2026

Gwinnett County Government·Georgia

61% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

County of San Luis Obispo·California

61% match

On-Call Emergency Geotechnical Engineering Services Storm Damage Response and Repair

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Transportation·Colorado

61% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

U.S. Department Of The Interior·Colorado

61% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

Stafford County Public Schools·Virginia

60% match

Replace Mechanical Systems II at Rocky Run Elementary School

Closes 11/23/2026Opened 10/28/2026

City of Grand Forks·North Dakota

60% match

2024 Outfall Repairs

Rolling / TBD closeOpened 3/28/2024

Pennsylvania Department of Environmental Protection·Pennsylvania

60% match

Abandoned Mine Reclamation Project – North Liberty South (Slippery Rock Township, Butler County & Liberty Township, Mercer County)

Closes 12/3/2026Opened 10/30/2026