The contract is for the removal and replacement of the main inbound scales at the Weber County Transfer Station. The contract was awarded to two vendors, Scales Unlimited, Inc. and Wasatch West Contracting, LLC, with estimated delivery dates of 2/17/2025 and 3/1/2025, respectively. The contract includes the provision of new inbound scales and structure, with a total project cost of $394,190.00 for Scales Unlimited, Inc. and $574,723.00 for Wasatch West Contracting, LLC. The contract also includes terms and conditions, including a statement regarding debarment or suspension. Some key points about the contract include:
• The contract is for the removal and replacement of the main inbound scales at the Weber County Transfer Station.
• The contract was awarded to two vendors, Scales Unlimited, Inc. and Wasatch West Contracting, LLC.
• The estimated delivery dates for the two vendors are 2/17/2025 and 3/1/2025, respectively.
• The total project cost for Scales Unlimited, Inc. is $394,190.00, and for Wasatch West Contracting, LLC is $574,723.00.
• The contract includes terms and conditions, including a statement regarding debarment or suspension.