Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Manufacturing
  5. ›FSU MagLab Cooling Water Pump Design, Fabrication…

Awarded contract·Florida State University (FSU)·Florida

FSU MagLab Cooling Water Pump Design, Fabrication, Assembly and Test

Won by Flowserve Corporation$300kSingle Award
Contract source

Awarded vendors

  • Flowserve Corporation

Description

The contract is for the design, fabrication, assembly, and test of a centrifugal pump for the FSU National High Magnet Field Laboratory. The pump must meet specific requirements, including providing 2,000 gpm @ 1,125 ft. TDH flowing deionized water at 40F. The contract was awarded to Flowserve Corporation. Key aspects of the contract include: • The pump must be an ANSI process pump conforming to ASME B73.1 • The pump must have a direct connected 480V, 3 PH, 3 wire, 60 Hz motor suitable for variable frequency drive speed control • The assembly must include a common baseplate for pump and drive with vibration isolators • The system must be delivered and installed at the FSU National High Magnet Field Laboratory

Attached files

Key dates

Starts
4/18/2022

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Manufacturing
NAICS
333911
Solicitation №
ITN 6336-A

Contract value

$300,000

The contract value is not explicitly stated in the document. However, based on the scope of work, which includes the design, fabrication, assembly, and test of a centrifugal pump, the value could be estimated to be in the range of $100,000 to $500,000. This estimate is rough and may not reflect the actual value of the contract. Factors that could influence the contract value include the complexity of the pump design, the materials and equipment required, and the labor costs associated with the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Louisiana Grambling State University·Louisiana

Top match · 66%

(50) HEAT PUMP FAN COIL UNITS

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of Defense·Texas

65% match

PUMP, CENTRIFUGAL, COOLANT

Closes 11/4/2026Opened 10/21/2026

Florida State University·Florida

65% match

FSU InSPIRE Climatic Wind Tunnel

Closes 3/1/2027Opened 10/23/2026

U.S. Department Of Defense·United States of America

65% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/15/2026

U.S. Department Of Defense·Pennsylvania

64% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/15/2026

NYS Cornell University·New York

64% match

SUCF# 161105 Replace Cooling Tower - Kenneth Post Laboratory

Closes 11/13/2026Opened 10/22/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

63% match

Water Pumps

Closes 11/6/2026Opened 10/23/2026

City of Charlotte·North Carolina

63% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Trident Technical College·South Carolina

63% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

U.S. Department Of Justice·Indiana

63% match

FCC TERRE HAUTE Heating Condensate Pumps

Closes 11/2/2026Opened 10/6/2026

Trident Technical College·South Carolina

63% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

Mississippi State University·Mississippi

62% match

Sole Source Request to Purchase Rain Bird VFD Pump Station

Closes 11/4/2026Opened 10/22/2026

National Aeronautics And Space Administration·Alabama

62% match

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: 3D-Printed Injector for Cryogenic Fluid Management (MFS-TOPS-104)

Closes 3/2/2027Opened 3/24/2026

Village of Lake in the Hills·Illinois

62% match

PFAS & Iron Filtration System Design, Equipment, and Delivery

Closes 11/3/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

62% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/2/2026Opened 10/2/2026

U.S. Department Of Defense·Utah

62% match

FD2020-23-00059

Closes 11/8/2027Opened 12/30/2022

University of Missouri-Kansas City·Missouri

62% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Energy·Tennessee

62% match

Dry Vacuum Pump

Closes 11/6/2026Opened 10/30/2026

City of Stillwater·Oklahoma

62% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

University of North Dakota·North Dakota

62% match

FM365 UND Abbot Chiller

Closes 11/17/2026Opened 10/20/2026

Pennsylvania PA State Sys of Higher Ed·Pennsylvania

62% match

Mihalik Thompson Stadium DHW Replacement

Closes 11/19/2026Opened 10/21/2026

City of Fort Myers·Florida

61% match

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

State University of New York (SUNY)·New York

61% match

Chiller/Boiler Upgrades Johnson City Center - Mechanical & Plumbing

Closes 11/12/2026Opened 10/21/2026

U.S. Department Of Defense·Oregon

61% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

U.S. Department Of Defense·Ohio

61% match

Vacuum Turbo Pumps

Closes 11/13/2026Opened 10/14/2026