This contract covers the full restoration of the portable‑building roof systems at Summit Academy, including both single‑ply membrane and metal roofing sections. Work includes roof inspection, surface preparation, repair of details, application of fluid‑applied coatings, installation of reinforcing fabrics, construction of slip‑resistant walkways, and comprehensive testing and close‑out documentation. The project must be completed within a 44‑day window (Nov 25 2025 – Jan 8 2026) and adheres to California Title 24, DSA, prevailing‑wage, and safety regulations. The district supplies key coating materials, while the contractor provides labor, equipment, and any additional supplies. A 1‑year workmanship warranty and manufacturer warranties apply, with liquidated damages of $250 per day for schedule overruns.
• Scope: Roof examination, repair, coating (polyurethane elastomeric for single‑ply, acrylic for metal), fabric reinforcement, walkway top‑coat, testing, close‑out.
• Schedule: Mandatory job walk Sep 8 2025; construction limited to Dec 22 2025 – Jan 2 2026 winter break window (per Addendum #1) and overall 44‑day period.
• Award: Lowest responsive bid – Pacific Builders & Roofing Inc. (WSP Roofing) – total $34,870 (including 10 % allowance).