The contract is for the installation of two 50KW minimum parallel ground mount Photovoltaic systems at the Florida State University Center for Advanced Power Systems. The objective of the Invitation to Bid (ITB) is to find a solar photovoltaic manufacturing company to provide and install the systems. The scope of work and specifications outlines the requirements of the project and system to be installed. Some key points include:
• The contract was awarded to EnergyLink LLC with a bid of $199,684.38.
• The delivery and installation lead time is 1-2 months.
• The contract is for a solar PV system addition at the Florida State University Center for Advanced Power Systems.
• The university is looking for a company to provide and install two 50KW minimum parallel ground mount Photovoltaic systems.