The contract is for drainage improvements in the Fountainview Subdivision Sections 1 and 2 (2018) for Harris County Precinct 1. The project includes the construction of a detention pond and the upsizing of existing storm sewer pipes to convey the 2-year storm event. The contract was awarded to D & W Contractors, Inc. for $4,607,978. The project aims to reduce flood risk and strengthen resiliency in Harris County by alleviating structural flood damage to homes in the community. Key aspects of the contract include:
• Drainage improvements in the Fountainview Subdivision Sections 1 and 2 (2018) for Harris County Precinct 1
• Construction of a detention pond
• Upsizing of existing storm sewer pipes to convey the 2-year storm event
• Awarded to D & W Contractors, Inc. for $4,607,978
• Project aims to reduce flood risk and strengthen resiliency in Harris County