Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Construction
  5. ›Indian Creek (Albervan Street to Pflumm Road Stormwater…

Awarded contract·City of Olathe·Kansas

Indian Creek (Albervan Street to Pflumm Road Stormwater Improvements) - Civil

$3.5MSingle Award
Contract source

Description

The Indian Creek Stormwater Improvements project involves the construction of approximately 2,650 feet of stream stabilization along Indian Creek. The project includes the construction of a stacked stone wall, rip-rap, trail replacement, longitudinal peak stone, fiber encapsulated soil, grade control riffles, turf reinforcement mat, cushion rock, sanitary sewer encasement, round rail fence, native plantings, fence replacement, and tree planting. The bid documents and plans are available for download. • Stream stabilization: 2,650 feet • Stacked stone wall: 615 square feet • Rip-rap: 2,530 square yards • Trail replacement: 1,190 linear feet • Longitudinal peak stone: 1,440 linear feet • Fiber encapsulated soil: 1,300 cubic yards • Grade control riffles: 4 • Turf reinforcement mat: 12,370 square yards • Cushion rock: 142 cubic yards • Sanitary sewer encasement: 60 linear feet • Round rail fence: 1,310 feet • Native plantings: 5.8 acres • Fence replacement: included • Tree planting: included

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
2-C-006-14 - Civil

Contract value

$3,500,000

The contract value is not explicitly stated in the provided text. However, based on the scope of work, which includes stream stabilization, construction of a stacked stone wall, rip-rap, trail replacement, and other related work, the contract value is likely to be in the range of several hundred thousand to a few million dollars. A rough estimate of the contract value could be around $2-5 million, considering the complexity and scope of the project.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Town of South Hill·Virginia

Top match · 72%

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

James City County·Virginia

71% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

Nevada Government·Nevada

71% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Indianapolis·Indiana

71% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

City of Charlotte·North Carolina

70% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

Municipality of Skagway·Alaska

70% match

West Creek Levee Improvements

Closes 11/9/2026Opened 10/12/2026

City of Lebanon·Indiana

70% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

City of Charlotte·North Carolina

70% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

Town of Jupiter·Florida

70% match

Sims Creek Preserve

Closes 11/4/2026Opened 9/22/2026

City of Austin·Texas

70% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

City of Ketchikan·Alaska

69% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

City of Charlotte·North Carolina

69% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

Clark County·Nevada

69% match

Cottonwood Avenue Ponding Mitigation and Sim Street Improvement

Closes 11/3/2026Opened 10/13/2026

City of Shawnee·Kansas

69% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Indianapolis·Indiana

69% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

City of Austin·Texas

69% match

Boggy Creek MLK TOD Strmwater Conveyance Improvements Ph-3

Rolling / TBD closeOpened 9/14/2026

City of Charlotte·North Carolina

69% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

Massachusetts Town of Marion·Massachusetts

68% match

Creek Road Pump Station Resiliency Improvements

Closes 12/2/2026Opened 10/21/2026

St. Lucie County - Purchasing Department·Florida

68% match

Avenue M New Entrance Road & Stormwater Pipeline Relocation at Harbour Pointe

Closes 11/18/2026Opened 10/4/2026

Town of Eatonville·Florida

68% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Charlotte·North Carolina

68% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Lynchburg·Virginia

68% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Catawba Regional Council of Governments·South Carolina

68% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Indianapolis·Indiana

68% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

Orangeburg County·South Carolina

68% match

Roadway, Water, and Wastewater Improvements to Chase Street

Closes 12/3/2026Opened 10/26/2026