Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Engineering Services
  5. ›Midwest Interstate Trail

Awarded contract·McHenry County·Illinois

Midwest Interstate Trail

$2.5MSingle Award
Contract source

Description

The Midwest Interstate Trail project seeks a qualified engineering firm to deliver comprehensive Phase I preliminary engineering services for a multi‑use trail spanning McHenry and Lake Counties, Illinois, with an optional Phase II design phase. The scope includes topographic and drone‑based surveys, drainage, floodplain and wetland studies, geotechnical reporting, traffic and crash analysis, intersection design, lighting analysis, alternatives analysis, permitting coordination, public involvement, and production of final design documents. The solicitation requires IDOT pre‑qualification in multiple engineering categories and emphasizes drone/LiDAR capability, use of Bluebeam Revu for reviews, Bentley ProjectWise for document sharing, and Microsoft Teams for communication. Submissions must be electronic PDFs, include mandatory forms (vendor form, W‑9, certificates, resume, past‑project documentation), and adhere to the County’s standard terms, conditions, and purchasing ordinance. • Phase I: 24‑36 months of preliminary engineering (surveys, studies, reports, permitting, coordination). • Phase II (optional): 12‑18 months of detailed design, permitting, and final construction documents. • Key requirements: IDOT pre‑qualification, drone/LiDAR capability, Bluebeam Revu, ProjectWise, and Microsoft Teams usage. • Submission format: electronic PDFs via email, 20 MB per email limit, mandatory cover page and vendor certifications. • Evaluation criteria focus on technical approach, staff capability, specialized expertise, workload capacity, and past performance.

Attached files

Key dates

Bids closed
7/19/2024
Contract modified
7/9/2024
Starts
12/1/2024
Duration
30 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
24-7453

Contract value

$2,500,000

While the solicitation does not disclose a contract value, Phase I preliminary engineering for a multi‑county trail typically ranges from $1.5 million to $3 million, based on comparable regional trail projects. Assuming an average hourly rate of $180 for senior engineers and $120 for staff, and estimating 12,500 hours of senior‑level work plus 20,000 hours of staff‑level work over a 30‑month period, the total cost approximates $2.5 million. The optional Phase II design phase could add another $1 million to $1.5 million, but because Phase II is optional and not yet funded, the primary contract value is estimated around $2.5 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Minnesota Department of Administration·Minnesota

Top match · 63%

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Illinois Natural Resources·Illinois

63% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

Iowa City·Iowa

60% match

Highway 6 Trail - Broadway Street to Fairmeadows Boulevard Iowa DOT Project Number: TAP-U-3715(674)--8I-52

Closes 11/17/2026Opened 10/21/2026

Missouri Department of Transportation·Missouri

59% match

SW District, City of Ozark, Construction of two multiuse trail projects

Closes 11/12/2026Opened 10/14/2026

City of Goshen, Indiana·Indiana

59% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Illinois Department of Transportation·Illinois

58% match

Transportation Alternatives Program - Metropolitan Planning Organization +200,000 population selected

Closes 12/18/2026Opened 10/19/2026

Missouri Department of Transportation·Missouri

58% match

NW District, City of Maryville, South Mani Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

Cobb County·Georgia

57% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Cincinnati·Ohio

57% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Missouri Department of Transportation·Missouri

57% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

U.S. Department Of Transportation·Washington

57% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

City of Cincinnati·Ohio

57% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Georgia Cobb County Department of Transportation·Georgia

56% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

County of Fairfax·Virginia

56% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

City of Lincoln·California

56% match

Trail Maintenance RFP

Closes 11/13/2026Opened 10/21/2026

Iowa Transportation·Iowa

55% match

Iowa DOT Repair Shop Annex Overhead Door Tracks

Closes 11/10/2026Opened 10/25/2026

Maryland Department of Natural Resources·Maryland

55% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/3/2026Opened 10/9/2026

City of Kearney·Missouri

55% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Delaware County·Pennsylvania

55% match

Mineral Hill Park Trail Improvements (eDPW-111826)

Closes 11/18/2026Opened 10/28/2026

Ohio Department of Natural Resources·Ohio

55% match

PWC Hocking Hills Winter Hike 2027 Busing

Closes 11/13/2026Opened 10/23/2026

City of Rogers·Arkansas

55% match

REQUEST FOR LETTERS OF INTEREST - US-71B CORRIDOR STUDY AND RAILYARD LOOP TRAIL UNDERCROSSING STUDY

Closes 11/3/2026Opened 10/13/2026

Illinois THA - Toll Highway Authority·Illinois

55% match

RR-26-2066 Jane Addams Meml Tlwy I-90 Rdwy and Bridge Rehab and Plaza Impr Rock Cut Pk Rd to Genoa R

Closes 12/3/2026Opened 10/22/2026

Haines Borough·Alaska

55% match

Snow Removal for Historic Dalton Trail (Eagle Vista Subdivision)

Rolling / TBD closeOpened 9/24/2026