The City of Chico has awarded a contract for the provision of roadway materials, including aggregate base, asphalt concrete, and hydro patch, for the fiscal year 2023/2024. The contract was awarded to multiple vendors, including Knife River Chico, Knife River Orland, Franklin Construction, Vulcan, Gray Rock Trucking, and Green Dream. The contract commences on July 1, 2023, and ends on June 30, 2024. The vendors will provide the materials as needed during the contract period.
• The contract includes prices per ton for each material, as well as minimum load delivery requirements and travel times.
• The vendors are responsible for delivering the materials to the City of Chico's designated locations.
• The contract also includes provisions for standby time and minimum charges.
• The City of Chico reserves the right to terminate the contract if the vendors fail to meet the contract requirements.