Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Tennessee
  4. ›Construction
  5. ›Construction for 440 Greenway Extension along Park Plaza

Awarded contract·Metropolitan Government of Nashville and Davidson County·Tennessee

Construction for 440 Greenway Extension along Park Plaza

$2.5MAwarded 6/30/2026Single Award
Contract source

Description

This RFQ solicits a single‑source construction contract for the 440 Greenway Extension along Park Plaza in Nashville, TN. The work includes constructing a 14‑ft concrete greenway with planting strip, installing raised crosswalks, extending a retaining wall, reconstructing existing pavement, providing storm‑water modifications, traffic control, and installing new lighting for both existing and new sections of the Greenway. The contract will be awarded to the lowest responsive and responsible bidder under an invitation‑to‑bid (sealed) process, with a 150‑day offer validity period and required performance and payment bonds for contracts exceeding $100 k. Key compliance items include Tennessee contractor licensing (HRA classification), extensive insurance coverage, EBO goals (6 % MBE, 4 % WBE), drug‑free workplace affidavit, and adherence to TD‑DOT standards, Metro storm‑water regulations, and ADA requirements. • Scope: concrete greenway, crosswalks, retaining wall extension, pavement reconstruction, lighting, storm‑water and traffic control. • Procurement: RFQ GG000071, sealed ITB, award to lowest responsive bid; close date extended to 7 July 2026. • Compliance: Tennessee HRA license, $1 M GL, $100 k employer liability, bonds > $100 k, 1‑year warranty, 30‑day safety reports, MBE/WBE participation goals.

Attached files

Key dates

Bids closed
7/7/2026
Intent to award
6/30/2026
Awarded
6/30/2026
Contract modified
7/7/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
GG000071

Contract value

$2,500,000

No contract value is disclosed, but the requirement for separate payment and performance bonds (> $100 k) indicates the award will exceed that threshold. Considering the extensive scope—14‑ft wide concrete greenway, multiple crosswalks, retaining wall extension, lighting, storm‑water upgrades, and associated civil‑engineering work—similar municipal greenway projects in comparable U.S. cities typically range from $1.5 M to $4 M. Factoring in material costs, labor, equipment, insurance, and the 1‑year warranty, a reasonable ballpark estimate is roughly $2.5 million. This estimate assumes mid‑range unit costs for concrete, asphalt, lighting fixtures, and civil‑engineering labor in the Nashville market.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Transportation·Wyoming

Top match · 68%

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

Pierce County·Washington

68% match

Orangegate Park Phase 1 Site Improvements

Closes 11/10/2026Opened 10/7/2026

City of Harrisonburg·Virginia

68% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Town of Babylon·New York

67% match

BID# 26G49 - CONSTRUCTION OF BIOSWALE AT GEGIER PARK

Closes 11/19/2026Opened 10/30/2026

Illinois Tollway·Illinois

67% match

I-26-2059 - Plaza Improvements

Closes 11/13/2026Opened 10/3/2026

City of Fort Wayne·Indiana

67% match

0482S - St. Joe Center Road Sidewalk Extension

Closes 11/12/2026Opened 10/29/2026

Camden County·New Jersey

66% match

Newton Lake Park & Cooper River Park Path Improvements Project

Closes 11/18/2026Opened 9/10/2026

Great Rivers Greenway·Missouri

66% match

GRG 2026-009-725I - Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project

Closes 11/6/2026Opened 10/12/2026

City of Etowah·Arkansas

66% match

PARK IMPROVEMENTS TO INCLUDE EXTENSION OF WALKING TRAIL, REPAIR OF EXISTING WALKING TRAIL AND OTHER IMPROVEMENTS

Closes 11/10/2026Opened 10/18/2026

NYS East Fishkill, Town of·New York

66% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

U.S. Department Of Transportation·North Dakota

66% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

City of Tustin·California

65% match

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

City of Lake Wales·Florida

65% match

RFP 27-02 GC Services for Kiwanis Park Loop Trail

Closes 11/4/2026Opened 9/30/2026

Illinois Tollway·Illinois

65% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

U.S. Department Of Transportation·Washington

65% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 9/23/2026

City of Goose Creek·South Carolina

65% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026

City of Richmond·California

65% match

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

Massachusetts Town of Stoughton·Massachusetts

65% match

FY27 Halloran Park Walkway Stoughton Diversity Monument Site

Closes 11/12/2026Opened 10/28/2026

Illinois Natural Resources·Illinois

65% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Charlotte·North Carolina

65% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

U.S. Department Of Transportation·Colorado

65% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

Miami-Dade County·Florida

65% match

Olympic Park - Walkway Repairs Rebid

Closes 11/6/2026Opened 10/8/2026