Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›HSTS 3004 Kendall Rd. Copley, Ohio 44321

Awarded contract·Summit County Executive·Ohio

HSTS 3004 Kendall Rd. Copley, Ohio 44321

Won by Wood Investment Property, LLC$16kSingle Award
Contract source

Awarded vendors

  • Wood Investment Property, LLC

Description

The contract is for the replacement of a household sewage treatment system (HSTS) at a location in Copley, Ohio. The system must be NPDES compliant and capable of treating at least 240 gallons per day. The contractor is responsible for locating all water wells and ensuring that the existing septic is pumped, crushed, and filled according to state and local code. The contract was awarded to Wood Investment Property, LLC for a total of $16,499.00. The key aspects of this contract include the installation of a new HSTS, the removal and disposal of the existing septic, and the connection of downspouts. The contractor must also provide warranties for the work and ensure that all permits are obtained. • The contract is for a single location in Copley, Ohio. • The system must be NPDES compliant and capable of treating at least 240 gallons per day. • The contractor is responsible for locating all water wells and ensuring that the existing septic is pumped, crushed, and filled according to state and local code. • The contract was awarded to Wood Investment Property, LLC for a total of $16,499.00. • The contractor must provide warranties for the work and ensure that all permits are obtained.

Attached files

Key dates

Starts
9/16/2022
Ends
10/11/2022

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
22132
Solicitation №
HSTS 2022-12

Contract value

$16,499

Based on the contract award amount of $16,499.00, it appears that the estimated value of the contract is around $16,499.00. This amount is likely to cover the costs of materials, labor, and other expenses associated with the replacement of the household sewage treatment system. The contract also requires the contractor to provide warranties and ensure that all permits are obtained, which may add to the overall cost. However, the contract award amount of $16,499.00 is likely to be the primary cost associated with this contract.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Cincinnati·Ohio

Top match · 66%

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 10/27/2026

City of Cincinnati·Ohio

65% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/12/2026Opened 9/10/2026

City of Cincinnati·Ohio

65% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 9/10/2026

City of Cincinnati·Ohio

65% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 10/9/2026

Ohio Department of Public Safety·Ohio

63% match

DPS-260008 (25-26053) Shipley Cooling Tower Replacement

Closes 11/10/2026Opened 10/15/2026

Lucas County, OH Facility Management·Ohio

62% match

CIP 26-011 EMS Generator

Closes 11/12/2026Opened 10/9/2026

Central Ohio Transit Authority (COTA)·Ohio

62% match

COTA Bus Passenger Shelter Cleaning Services

Closes 11/9/2026Opened 10/9/2026

Ohio Department of Rehabilitation and Correction·Ohio

62% match

McKinley Ave Roof-DRC270104-714

Closes 11/4/2026Opened 10/20/2026

City of Lima·Ohio

61% match

Lima Fire Department Firefighter Physicals for 2027-2029

Closes 11/4/2026Opened 10/17/2026

City of Cincinnati·Ohio

61% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/5/2026Opened 10/22/2026

City of Shawnee·Kansas

61% match

Ordinance No. 3518

Closes 3/4/2031Opened 3/4/2025

Columbus City Schools·Ohio

61% match

CCS Project No.27008B - Partial Roof Replacement at Highland ES

Closes 11/5/2026Opened 10/21/2026

Ohio Department of Natural Resources·Ohio

61% match

PWC Hocking Hills Winter Hike 2027 Busing

Closes 11/13/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·Ohio

60% match

C1DA--AE Replace Roofing 539-25-101

Closes 11/4/2026Opened 10/20/2026

Montgomery County OH·Ohio

60% match

Cash-in-Transit (Armored Car) Services

Closes 12/2/2026Opened 10/30/2026

Medina County, OH Sanitary Engineering·Ohio

60% match

Chatham Water Tower Rehabilitation 2027

Closes 11/6/2026Opened 10/16/2026

The City of Columbus·Ohio

60% match

RFQ033952 - 6009-PAWP- Siemens Hydroranger & Echomax

Closes 11/3/2026Opened 10/27/2026

City of Cincinnati·Ohio

60% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 10/28/2026

City of Fairfield·Ohio

60% match

Installation of 7,000‑ft separated shared‑use asphalt path on Pleasant Avenue (US 127) – resurfacing, storm sewer, water main, curb, retaining walls, and signalized crosswalks in Butler County, Ohio.

Closes 11/17/2026Opened 10/23/2026

Ohio Department of Purchasing Services·Ohio

60% match

435964ls OSP Reference Books LCS

Closes 11/10/2026Opened 10/23/2026

City of Findlay·Ohio

60% match

North Town Sanitary Sewer Replacement

Closes 11/12/2026Opened 10/28/2026

City of Cleveland·Ohio

60% match

574 - Chevrolet Car & Truck Replacement Parts and Labor

Closes 11/12/2026Opened 11/14/2025

City of Piqua·Ohio

60% match

CITY OF PIQUA OHIO - Drake Road Water Booster Pumping Station - Project #24-17.3

Closes 11/19/2026Opened 10/11/2026

Ohio Department of Natural Resources·Ohio

60% match

DNR (1) 1 Ton 4x4 gasoline crew cab short bed truck

Closes 11/12/2026Opened 10/28/2026

City of Cincinnati·Ohio

60% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026