This rebid solicitation concerns the renovation of the Greenway Terrace Playground’s surface and associated site work. The primary scope is the installation of a resilient, colored‑granule surface over approximately 4,700 sf. Mandatory alternate items—required regardless of the primary bid—include inlet protection, removal of an existing sidewalk, placement of crushed aggregate base course, park shaping and grading, construction of a new 4‑inch concrete sidewalk, and provision of topsoil and sod. Pricing is presented on a unit‑price basis, with a total base‑bid cost of about $192 k and an alternate‑bid cost of approximately $194 k. Only one vendor, Perfect Turf Distributing LLC, appears in the tabulation. The bid opening occurred on 26 June 2026 at 11:00 AM CDT, posted on the City of Waukesha’s bid‑tabs portal. No award, start, or end dates are provided.