The Franklin Boulevard/43rd Avenue Storm Drain Improvement Project involves replacing approximately 1,175 lineal feet of existing arch corrugated metal storm drain pipe, installing thirteen manholes, replacing three inlets, and removing and replacing existing curb, gutter, and sidewalk. The estimated construction cost is $1,105,000. The project was awarded to multiple vendors, including Sierra National Construction, RAK Pacific Construction, Mountain Cascade Inc., and McGuire and Hester.
• The project consists of replacing the existing storm drain system located behind sidewalk in place and within Franklin Boulevard.
• The project includes installation of thirteen manholes, replacement of three inlets, removal and replacement of existing curb, gutter, and sidewalk, and replacement of two sidewalk ramps.
• The estimated construction cost is $1,105,000.
• The project was awarded to multiple vendors.
• The vendors that were awarded this contract are listed in the bid opening summary document.