This contract concerns the demolition of a vacant, brick‑framed structure located at 2211 Barrets Lane in Mobile, Alabama. The City of Mobile’s Municipal Enforcement Department solicited a stipulated‑sum quote and awarded the contract to AA&A DEMOLITION. The scope includes wet demolition, utility cap‑off, complete debris removal, lead‑based paint and asbestos handling, erosion‑control BMP installation, site stabilization, and final close‑out documentation. The contractor must finish the work within 15 calendar days after receiving the Notice to Proceed, with a $250 per day liquidated‑damage charge for delays. All required insurance, E‑Verify enrollment, and lien releases must be provided as part of the contract compliance.
• Wet demolition of the existing structure plus footings and slabs
• Cap‑off of water, sewer, and gas utilities and safe disposal of hazardous materials
• Installation of temporary and permanent erosion‑control measures, followed by seeding and mulching
• Submission of comprehensive close‑out documents, including before/after photos and lien releases