This contract obligates the awarded contractor to perform a full nuisance‑abatement demolition of all structures at 1103 Gimon Circle West, Mobile, AL. The work includes wet demolition, utility disconnection and capping, hazardous‑material handling (lead‑based paint and asbestos), debris removal, temporary erosion and sediment controls, and post‑demolition site restoration with seeding and mulching. The contractor must also provide required insurance, E‑Verify proof, signed agreements, and post‑completion documentation, including a newspaper notice of final completion.
• Wet demolition of existing structures, footings, and slabs.
• Utility shutdown, hazardous‑material (LBP/ACM) management, and debris disposal.
• Installation of BMPs for erosion control and final site seeding/grassing, plus required close‑out paperwork.