The City of Independence, Missouri, seeks a qualified firm or consultant team to perform a long-term (20-year) utility future requirements study. The contract was awarded to Sawvell and Associates. The scope of work includes performing a strategic plan for Independence Power & Light (IPL).
• The contract is for a utility future requirements study.
• The study will be for a 20-year period.
• The contract was awarded to Sawvell and Associates.
• The City of Independence, Missouri, is the agency that created and decided to award this contract.