This posting is an informational notice that provides the Integrated Priority List (IPL) of design‑and‑construction projects the Air National Guard plans to award in Fiscal Year 2027. The list aggregates National Guard Bureau (NGB) Military Construction (MILCON) and Facilities Sustainment, Restoration, and Modernization (FSRM) funded projects, but excludes installation‑level funded work. The document enumerates over 150 individual line items covering repairs, new construction, demolitions, and upgrades of airfield infrastructure, hangars, utility systems, waste‑water treatment, lighting, HVAC, and security perimeters across more than 30 states and territories. No solicitation, deadline, or submission requirements are included; the posting is purely for vendor awareness.
• Covers a wide range of construction and engineering tasks (e.g., fire‑suppression repairs, runway/taxiway construction, HVAC replacement, waste‑water system upgrades).
• Projects are geographically dispersed (Alaska, Arizona, California, Texas, etc.) and tied to specific Air National Guard bases and civilian airports.
• Each line item includes a short title, project number, and base location, but no detailed scope, budget, or schedule.
• No pre‑bid meetings, site visits, or question‑submission windows are indicated.
• Intended audience: Architect‑Engineer (A‑E) firms and construction contractors interested in future ANG work.