The contract is for the Koloa Safe Routes to School, Phase 2, Fed-Aid Project No. SRS-0700(076) project, which includes construction of new sidewalk, new curb, new curb and gutter, new curb ramps, reconstructing select curb ramps to comply with ADA requirements, pavement widening, installing storm drain structure and pipe, replacement of drain inlet grates, removing and installing chain link fence, pavement striping and marking, relocation and removal of existing signage, and new signage including two sets of rectangular rapid flashing beacons (RRFBs). The contract amount is $922,277.05. The project is funded by the Federal Highway Administration and the County of Kauai.
Some key features of the contract include:
* The project includes construction of new infrastructure such as sidewalks, curbs, and gutters
* The project includes installation of storm drain structures and pipes
* The project includes removal and installation of chain link fence
* The project includes pavement striping and marking
* The project includes relocation and removal of existing signage
* The project includes installation of new signage including two sets of rectangular rapid flashing beacons (RRFBs)
* The contract amount is $922,277.05
* The project is funded by the Federal Highway Administration and the County of Kauai