The City of Minneapolis is seeking a sealed, single‑award bid to provide “Safe Routes to School” improvements on the South‑Folwell corridor. The contract is a lump‑sum, heavy‑construction effort that includes demolition, removal of existing pavement, curb and gutter, signage, and drainage structures, followed by new concrete pavement, curb design, drainage installations, traffic‑control measures, and associated erosion‑control and site‑work. All work must comply with prevailing‑wage, Buy America, DBE, and minority‑business participation goals, and the successful bidder must furnish a 5 % bid deposit, performance and payment bonds, and required certifications.
• Scope covers full design‑build of roadway, sidewalk, curb, drainage, signage, and traffic‑control improvements for school‑safety.
• Lump‑sum quantity of 1 unit; bidders must price all line items listed in the detailed Bid Form (over 80 individual tasks).
• Mandatory compliance with Davis‑Bacon prevailing‑wage rates, Minnesota labor statutes, and grant‑funded contract provisions; bid deadline is 2 PM CST on 12 Nov 2026.