This contract covers the complete restoration of the City of Plymouth’s central municipal parking garage, encompassing structural concrete repairs, drainage upgrades, joint‑sealant replacement, traffic‑coating application, and pavement‑marking repaint. The work is divided into unit‑price items (e.g., concrete repair per square foot, trench‑drain installation, floor‑drain replacement) and is subject to strict timelines: bids were due July 30 2024, the contract was awarded mid‑August, substantial completion is required by October 18 2024, and final completion by November 1 2024. The DDDA provided a pre‑bid conference, required a bid bond, and reserves the right to waive irregularities. The awarded vendor, RAM Construction Services, will perform all trades, coordinate traffic control, and comply with Michigan Building Code, AIA contract documents, and extensive warranty provisions.
• Scope includes concrete delamination repair, epoxy‑coated reinforcement, new trench‑drain and floor‑drain installation, joint‑sealant renewal, and traffic‑coating system application.
• Contract value is capped at approximately $54.5 K (base bid plus 40 % contingency).
• The project follows a unit‑price pricing structure with retainage and liquidated‑damage provisions.