This contract funds the construction of a new concrete sidewalk along Flagler Avenue between 12th Street and Park Avenue in the City of Edgewater, FL. The work includes demolition of existing pavement, milling, installation of new 4‑in. concrete sidewalks (and 6‑in. concrete driveways where vehicles cross), curb & gutter, detectable warning surfaces, ADA‑compliant crosswalks, utility adjustments, erosion control, and related signage. The project is funded by the Florida Department of Transportation (FDOT) and must comply with FDOT FY 2017‑2018 design standards. The contract was awarded through a full and open competitive bidding process, ultimately to ThadCon, LLC after a protest resolved the initial low‑bid award.
• Scope: sidewalk construction, concrete paving, utility relocation, traffic control, landscaping, and ADA features.
• Budget: total contract amount approximately $402,000 (city‑funded items bring the total to $409,348.41).
• Schedule: bid deadline Dec 20 2017, award Jan 23 2018, council approval Feb 5 2018; construction start and completion dates not disclosed.
• Compliance: FDOT specifications, ADA, and local engineering standards must be met; all required affidavits and paperwork were required for bid acceptance.