The contract is for the fire hydrant standardization project in 2018. The work includes removing existing fire hydrant assemblies, installing replacement fire hydrant assemblies, and other related tasks. The contract was bid on by several companies, with the lowest bid being $333,759.25. The project involves various items such as mobilization, traffic control, potholing, rock excavation, and water pollution control. The contract is expected to be completed within a certain duration, but the exact duration is not specified.
• The contract involves multiple tasks, including removal and installation of fire hydrant assemblies, and other related work.
• The contract was bid on by several companies, with the lowest bid being $333,759.25.
• The project involves various items, such as mobilization, traffic control, potholing, rock excavation, and water pollution control.
• The contract is expected to be completed within a certain duration, but the exact duration is not specified.