This contract is for the replacement of hoist door operators at Public Works Bldg 275. The scope of work includes replacing the barrel assembly, headplate bracket, head plate, shaft adjusting wheel, and other supporting hardware, as well as replacing approximately 5 curtain slats. The contract also includes shipping, handling, labor, and disposal of old materials. The total contract value is $13,144.69. Key points to consider are the specific requirements for the replacement of the door operators, the need for shipping and handling, and the importance of proper disposal of old materials.
• Replacement of hoist door operators
• Replacement of barrel assembly and associated parts
• Replacement of curtain slats
• Shipping, handling, and labor
• Disposal of old materials