This contract, awarded by the City of Madison, funds the complete replacement and upgrade of sanitary sewer infrastructure along Troy Drive and Green Avenue, combined with full roadway resurfacing, curb and sidewalk reconstruction, and extensive utility coordination. The work includes installation of new PVC sewer mains, trench‑patch Type IV work, full‑width grinding and asphalt paving, traffic‑control provisions, temporary bus‑stop pads, and compliance with state separation standards. The project also requires coordination with AT&T, Madison Gas & Electric, and a concurrent Madison Mental Health Institute underground‑utility project.
• 3,121 ft of new 15‑in. PVC sanitary sewer pipe and associated laterals.
• Full‑width grinding, pulverizing, and new HMA pavement over ~4,000 ft of roadway.
• Comprehensive traffic‑control plan, temporary bus‑stop pad, and “No‑Parking” signage.
• Substantial utility relocation and trench‑patch work (Type IV) across multiple utility networks.
• $1.88 M contract value with a 4 % Small‑Business Enterprise goal and liquidated‑damage provisions for schedule overruns.