This contract covers the design‑build construction of new recreational facilities in Madison, Wisconsin: eight pickleball courts at Warner Park and a futsal (indoor soccer) court with associated lighting at Worthington Park. The scope includes site demolition, grading, storm‑water management, asphalt and concrete paving, installation of chain‑link fencing, net posts, bike racks, line painting, and a full lighting system supplied by Musco. The contract also requires bio‑retention basins, erosion‑control matting, utility protection, and full coordination with existing park utilities.
• Civil works: excavation, grading, storm‑sewer pipe (8 in. PVC), bio‑retention basin, asphalt paving (≈ 10,560 sf) and concrete sidewalks.
• Site amenities: chain‑link perimeter fence, gates, net posts, bike racks, and pickleball court line painting.
• Electrical scope: Musco “Mini‑Pitch” lighting system (two 24‑ft poles, LED fixtures), control‑link remote operation, conduit, hand‑holes, and related power distribution.
• Environmental controls: Class 1 urban erosion‑control matting, native seed planting, preservation of existing utilities and wetlands.
• Schedule: Estimated start 25 May 2026; bid opened 2 Apr 2026; award to Parisi Construction, LLC on 21 Apr 2026. The total bid value for both parks is approximately $1.66 million.