The contract is for the re-painting of the decorative tube steel framework on the exterior of the Hesperia City Hall. The work includes removal of existing flaking paint, preparation of surface areas, and re-painting of the framework. The estimated cost of the project is between $20,000 and $25,000. The contract was awarded to Next Generation Painting, Inc., who was the apparent low bidder. The City of Hesperia conducted due diligence to ensure the submitted bid was in order and references were satisfactory. Some key points about the project include:
• The project involves re-painting of the decorative tube steel framework on the exterior of the Hesperia City Hall.
• The estimated cost of the project is between $20,000 and $25,000.
• The contract was awarded to Next Generation Painting, Inc.
• The City of Hesperia conducted due diligence to ensure the submitted bid was in order and references were satisfactory.
• The project requires removal of existing flaking paint, preparation of surface areas, and re-painting of the framework.