Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›PWC - Camano Substation Site Construction

Awarded contract·Snohomish County PUD·Washington

PWC - Camano Substation Site Construction

Won by PELLCO CONSTRUCTION INC$1.9MSingle Award
Contract source

Awarded vendors

  • PELLCO CONSTRUCTION INC

Description

The contract is for the construction of the Camano Substation Site, which includes demolition and removal work, site construction work, and other related tasks. The contract was awarded to PELLCO CONSTRUCTION INC in the amount of $1,901,000.00, plus tax. The project is located in Island County, Washington, and the work is expected to be completed according to the terms of the contract. • The project includes rebuilding an existing electrical distribution substation on District property. • The substation will not be energized or connected to the electric system. • Demolition and removal work includes equipment foundations, conduits/buried cables, grounding grid, fencing, storm drainage, asphalt pavement, trees, and ornamental landscaping. • Site construction work includes temporary erosion and sedimentation controls, construction stormwater monitoring and reporting, earthwork, storm drainage conveyance system, and other related tasks.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
24-1458-KS

Contract value

$1,901,000

The contract value is estimated to be $1,901,000.00, plus tax, based on the intent to award document. This estimate is based on the low evaluated bid from PELLCO CONSTRUCTION INC. The engineer's estimate for the project was $2,266,770.00, but the actual contract value is lower due to the competitive bidding process.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Gallup·New Mexico

Top match · 68%

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

City of Springfield·Illinois

65% match

Alpha Substation Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

California Department of Transportation·California

65% match

Construct RW, SW, HMA Pvmt, drainage, and Elect systems.

Closes 11/10/2026Opened 9/21/2026

Jea·Florida

65% match

1412223281 (ITN) Enterprise Asset Management Software Solution

Rolling / TBD closeOpened 10/1/2026

University of Maryland - Baltimore·Maryland

63% match

Electrical Substation Expansion and Improvements at Towson University

Closes 12/8/2026Opened 10/28/2026

Snohomish County PUD·Washington

63% match

PWC - AT&T 2026-27 Cell Site Mods

Closes 11/10/2026Opened 10/23/2026

Maryland Transit Administration·Maryland

63% match

Metro Traction Power Substation Emergency Trip Stations (TPSS ETS) Installation at Various Locations [T-1564-0150]

Closes 11/19/2026Opened 10/1/2026

U.S. Department Of The Interior·New Mexico

63% match

Y--Turnout Buildings

Closes 11/10/2026Opened 10/13/2026

NYS MTA - Metro-North Railroad·New York

62% match

REPLACEMENT OF SEVEN (7) POWER SUBSTATION ROOFS

Closes 11/17/2026Opened 10/2/2026

City of Cape Canaveral·Florida

62% match

Stormwater Pilot Project

Closes 11/12/2026Opened 10/15/2026

City of Richland·Washington

62% match

Tapteal Substation Bank 2 Oil Leak Repair

Closes 11/6/2026Opened 10/1/2026

The Metropolitan Water District of Southern California·California

62% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Springfield·Illinois

62% match

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

Connecticut Dept. of Correction·Connecticut

62% match

INSTALLATION OF IMPRESSED CURRENT CP SYSTEM

Closes 11/4/2026Opened 10/21/2026

Western Municipal Water District·California

62% match

PFAS Treatment at Arlington Desalter Plant

Closes 11/5/2026Opened 10/1/2026

City of El Paso·Texas

62% match

Pebble Hills Regional Command Center Renovation

Closes 11/18/2026Opened 10/20/2026

Austin Energy·Texas

62% match

Distribution Getaway Duct Bank Bore at East Village subst

Rolling / TBD closeOpened 7/21/2025

City of Columbus Ohio·Ohio

62% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

California Department of Transportation·California

62% match

RHMA (Gap Graded), cold plane AC Pvmt, HFST, Mod signals & lighting.

Closes 11/10/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

62% match

P210 ELECTRIC POWER PLANT AND ELECTRICAL DISTRIBUTION SYSTEM AT CHABELLEY AIRFIELD, DJIBOUTI

Closes 11/16/2026Opened 10/21/2026

Inland Empire Utilities Agency·California

62% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026

U.S. Department Of Defense·United States of America

62% match

Vehicle Maintenance Shop, Kadena Air Base

Closes 3/31/2027Opened 9/30/2026

City of Riverside·California

62% match

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Closes 11/24/2026Opened 10/15/2026

Iowa State University·Iowa

62% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

Confederated Tribes of the Colville Reservation·Washington

62% match

Traditional Territories Program, Concrete Slab Construction – Omak Fish and Wildlife Bullpen (Saint Mary’s Mission Campus)

Closes 11/26/2026Opened 10/23/2026