The contract is for the replacement of carpet and tile in the Smith Building, located in Cheyenne, Wyoming. The project involves the removal and installation of new flooring, with a total bid amount of $55,906.00 and $52,598.00 for the awarded vendors. The contract was awarded through a competitive bidding process, with multiple vendors submitting bids. The scope of work includes the replacement of flooring in the Smith Building, with the awarded vendors responsible for completing the work. Key aspects of the contract include the bid submission process, the evaluation criteria, and the contract terms and conditions.
• The contract was awarded to Kaiser Corporation and Masters Flooring, with a total bid amount of $55,906.00 and $52,598.00 respectively.
• The project involves the replacement of carpet and tile in the Smith Building, located in Cheyenne, Wyoming.
• The contract was awarded through a competitive bidding process, with multiple vendors submitting bids.
• The scope of work includes the replacement of flooring in the Smith Building, with the awarded vendors responsible for completing the work.
• The contract terms and conditions include the bid submission process, the evaluation criteria, and the contract terms and conditions.