The City of Roseville solicited proposals for a feasibility study to determine the possibility of installing a 180-foot high communications tower and associated radio equipment inside an existing substation. The study would include ground grid calculations, electromagnetic energy calculations, and other necessary studies to ensure City personnel safety and system integrity. The contract was not awarded, as the City rejected all proposals. Key aspects of the proposal included a detailed report, cost estimate, and construction work schedule.
• The proposal required a feasibility study for the installation of a communications tower and associated radio equipment.
• The study would include ground grid calculations and electromagnetic energy calculations.
• The City of Roseville rejected all proposals and does not intend to issue further RFPs for this feasibility report.
• The proposal included a detailed report, cost estimate, and construction work schedule.
• The City of Roseville is the agency responsible for the RFP.
• The contact person is Karl Grover, an IT Analyst.