The contract is for the rehabilitation and replacement of the Bird Creek Interceptor located within the Bird Creek neighborhood of Temple. The construction work includes the installation of new manholes, gravity sewer pipes, and the modification or removal of existing manholes. The contract also includes trenchless construction methods such as tunneling and auger boring. The scope of work involves approximately 4,200 linear feet of 30-inch gravity sewer pipe and 160 linear feet of 24-inch, 10-inch, or smaller gravity sewer pipes. The project requires the removal and replacement of several existing manholes and the installation of new manholes. The contract includes several alternate bids for different materials and construction methods, including fiberglass manholes and PVC pipe. The project requires the contractor to provide a bypass pumping plan and to perform bypass pumping as needed. The contract also includes a requirement for CCTV inspection of the new pipe.