Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Bird Creek Interceptor Phase 4B (Pecan Valley to Daniels…

Awarded contract·City of Temple·Texas

Bird Creek Interceptor Phase 4B (Pecan Valley to Daniels Drive)

Won by D Guerra Construction, LLC +4 more$12MMultiple Award
Contract source

Awarded vendors

  • D Guerra Construction, LLC
  • Santa Clara Construction, LTD
  • S.J.Louis Construction of Texas, LTD
  • Spiess Construction Company, Inc.
  • Thalle Construction Co., Inc.

Description

The contract is for the rehabilitation and replacement of the Bird Creek Interceptor located within the Bird Creek neighborhood of Temple. The construction work includes the installation of new manholes, gravity sewer pipes, and the modification or removal of existing manholes. The contract also includes trenchless construction methods such as tunneling and auger boring. The scope of work involves approximately 4,200 linear feet of 30-inch gravity sewer pipe and 160 linear feet of 24-inch, 10-inch, or smaller gravity sewer pipes. The project requires the removal and replacement of several existing manholes and the installation of new manholes. The contract includes several alternate bids for different materials and construction methods, including fiberglass manholes and PVC pipe. The project requires the contractor to provide a bypass pumping plan and to perform bypass pumping as needed. The contract also includes a requirement for CCTV inspection of the new pipe.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
54-02-20

Contract value

$12,000,000

The contract value can be estimated based on the bid tabulation. The base bid prices range from $10,580,869 to $13,437,446. The alternate bids add additional costs, with the total prices ranging from $10,603,002 to $13,782,510. Considering the different bid options and the scope of work, a reasonable estimate for the contract value is around $11 million to $13 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·Missouri

Top match · 64%

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

Nevada Government·Nevada

63% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Cobb County·Georgia

63% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

63% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Berkeley County·South Carolina

63% match

Paslay Drive Right-Of-Way Improvements

Closes 11/30/2026Opened 10/27/2026

Santa Clara Valley Water District·California

62% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

City of El Cajon·California

62% match

BROADWAY CREEK RESTORATION - PHASE B

Closes 11/16/2026Opened 10/14/2026

City of Charlotte·North Carolina

62% match

Four Mile Creek Rd 9427 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/9/2026

Johnson County Wastewater·Kansas

62% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Nevada Government·Nevada

62% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Virginia Department of Transportation·Virginia

62% match

353_SGR* - 2027 PLANT MIX - PRIMARY / SECONDARY

Closes 11/18/2026Opened 10/14/2026

City of Gainesville - Procurement Division·Florida

62% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Town of Cutler Bay·Florida

62% match

Cutler Bay US-1 Beautification Project-Phase 1

Closes 1/13/2027Opened 10/23/2026

Brazos Valley·Texas

61% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

City of Shawnee·Kansas

61% match

Ordinance No. 3522

Closes 6/3/2033Opened 6/3/2025

City of Redding·California

61% match

STILLWATER BUSINESS PARK PROJECT – PHASE 2A - TREE REMOVAL

Closes 11/5/2026Opened 10/20/2026

Maryland Baltimore County Government·Maryland

61% match

23001 SX0 Long Quarter Interceptor Rehabilitation

Closes 11/12/2026Opened 9/19/2026

Grove City, OH·Ohio

61% match

GROVE CITY NPDES PROGRAM COMPLIANCE SERVICES - BMP MAINTENANCE PLAN, HOOVER ROAD & LONDON‑GROVEPORT ROAD SITE, HOLTON ROAD SITE AND BRECK PARK SITE

Closes 11/6/2026Opened 10/21/2026

City of Cincinnati·Ohio

61% match

Little Miami Scenic Trail Shared Use Path PID 115291

Closes 11/18/2026Opened 10/28/2026

Washington County, Oregon·Oregon

61% match

Early Tree Removal for Capital Project Services

Closes 11/6/2026Opened 10/26/2026

Connecticut Town of Simsbury·Connecticut

61% match

Curtiss Park Trail State Project No. 128-158

Closes 11/17/2026Opened 10/15/2026

Nevada Government·Nevada

61% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

California Department of Transportation·California

61% match

SB Minor B-Install passageway for emergency vehicles-San Diego County

Closes 11/12/2026Opened 10/29/2026

El Dorado Irrigation District·California

61% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026

Town of Eatonville·Florida

61% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026