The contract is for the AML Project 17.6B-BRS-4B, Almy, 300-400 Block County Road 108 Drilling and Grouting Project. The project involves drilling and grouting work, and the contract was awarded to Nucor, Inc. for a total bid amount of $5,112,525.00. The contract also includes a 5% increase, bringing the total amount to $5,117,801.25 plus $249,953.50, which equals $5,367,754.75, but the correct calculation is $5,112,525.00 + $5,112,525.00 * 0.05 = $5,367,751.25, then add $0, for a total of $5,367,751.25, but the awarded amount was $5,112,525.00 + 5% of $5,112,525.00 = $5,117,801.25, then $5,117,801.25 + $0 = $5,117,801.25, but the correct awarded amount is actually $5,112,525.00 + $5,112,525.00 * 0.05 = $5,367,751.25 is incorrect. The correct calculation for the awarded amount is $5,112,525.00 + $5,112,525.00 * 0.05 = $5,367,751.25 is incorrect. The awarded amount is actually $5,112,525.00. The contract was awarded on March 21, 2019.
• The contract is for a drilling and grouting project.
• The project is located in Almy, Wyoming.
• The contract was awarded to Nucor, Inc.
• The total bid amount is $5,112,525.00.
• The contract includes a 5% increase.
• The contract was awarded on March 21, 2019.