This contract awards a $216,700 lump‑sum bid to upgrade safety at the intersection of E. Nob Hill Blvd. and S. 18th St. in Yakima, WA. The scope includes ADA‑compliant surveying, asphalt paving, concrete curb and gutter, sidewalk installation, temporary traffic control, utility adjustments, and a signal upgrade. The work is funded in part by a federal Housing and Sustainable Infrastructure Program (HSIP) grant and was selected through a full and open competition. The City Engineer recommended Current Electric NW, LLC as the contractor, and the City Manager signed the award on August 7, 2026.
• Primary civil‑engineering improvements: paving, curb‑gutter, and sidewalk construction.
• Electrical component: traffic signal upgrade and related junction box adjustments.
• Funding source: Federal HSIP grant (Fed Aid No. HSIP‑4566(01 1)).
• Procurement: Competitive sealed‑bid process with award made by the City Manager.