The contract is for the construction of the Roark Creek Trail, Segment 3, in Branson, Missouri. The work includes grading, paving, and storm drain culverts. The contract was bid on through a sealed bid process, and the bids were opened and read at City Hall. The contract documents include plans and drawings, which are available for download.
• The contract is for a construction project in Branson, Missouri.
• The work includes grading, paving, and storm drain culverts.
• The contract was bid on through a sealed bid process.
• The bids were opened and read at City Hall.
• The contract documents include plans and drawings.