Awarded vendors
- Redside Construction, LLC
Description
The contract is for the Midlakes Pump Station Capacity Improvements project, which includes demolition, excavation, and installation of new pump station, wet well, valve vault, and other components. The engineer's estimate for the project is $5,244,362.00 pre-tax and $5,738,797.00 with tax. The contract was awarded to Redside Construction, LLC, with a total bid price of $5,247,436.60 pre-tax.
• Demolition of existing pump station
• Demolition of existing building
• Excavation and installation of new gravity sewer, deep manholes, and force main
• Installation of new pump station, wet well, valve vault, and other components
• Groundwater control during construction using dewatering and/or ground freezing or other methods